Thursday, July 30, 2015

Meeting on the grading, retaining walls and landscaping now.  Roof started Tuesday, should be done by now.



 


Sunday, July 19, 2015

Electric walk-through today.  Next week AV and network walk-through.

House sinks as fill begins.


 
N may have trouble reaching this hose bibb - at least until the fill is complete. 





Entire house foundation seal and French drain.  Hard pipe on top to transfer rain water from gutters.





Rough HVAC complete.





Beautiful exterior trim detail.



Thursday, July 2, 2015

The roof arch and doors.  Rough plumbing done.  HVAC next.




Saturday, June 27, 2015

Wow, windows.



Even better, we did the HVAC and plumbing walk-throughs.  Very exciting.

Sunday, June 14, 2015

Tissue paper GAF Tiger Paw polypropylene roof underlayment rather than good old tar paper felt.  Very scary for an old timer.

 
New hip roof design over the porch to replace the planned shed roof.
 

I would mean seeing a little more roof from the guest bedroom.  We have to choose by Tuesday.  Also decide exterior trim materials.


Next week windows maybe.





Monday, June 8, 2015

Roof sheathing is on 6 June.





N in the guest shower.  The clipped back shower wall will not be a problem.  The attic is huge.


The closet under the stairs.  All the AV and network stuff in here.

 

The space over the garage.  PB is in training to finish this space someday.

Wednesday, May 27, 2015

Lookin' more like a house - 27 May.



Dining room window from the kitchen doorway.


Family room window from the dining room.


View from second floor loft and bedrooms.

Tuesday, May 19, 2015

Framing continues on May 19.  Grading discussed with landscaper and builder - there will be walls and terracing.



Guest bedroom window.

Monday, May 11, 2015

Thursday, April 30, 2015


April 30 - the foundation is built.  Framing started today.


 
 Short crawl space.






April 8 - trenches dug and footing poured.  Then the rain covered the footings with clay.

Thursday, March 26, 2015

Summer Lake [aka Echo Lake Two]


And so it begins …


 The Lot [Nov 2014]









 

 

After Bush Hogging [Dec 2014]

 


 


After Clearing [26 Mar 2015]




Next week foundations, barring too much rain.